Ii Viinamäki

Ten wind farms in operation

Kalajoki Mustilankangas

Wind farm consists of 28 pcs Vestas V126 WTGs and total capacity is 92,4 MW. Power production started in 2016.

Pori Peittoo

Wind farm consists of 12 pcs G128 Gamesa WTGs and total capacity is 54 MW. Power production started in the end of 2013.

Raahe Sarvankangas

Wind farm consists of 14 pcs V126 Vestas WTGs and total capacity is 48 MW. Power production started in yn 2017.

Salo Märynummi

Wind farm consists of 3 pcs G128 Gamesa WTGs and total capacity is 15 MW. Tuuliwatti owns two of the turbines. Power production started in 2014.

Siikainen Jäneskeidas

Wind farm consists of 8 pcs V126 Vestas WTGs. Total capacity is 26,4 MW. Power production started in 2015.

Simo Leipiö

Wind farm consists of 4 pcs G128 Gamesa WTGs. Total capacity is 18 MW. Power production started in winter 2014.

Simo 3

Wind farm consists of 3 sites: Leipiö II, Halmekangas and Onkalo II. There are altogether 27 pcs G128 Siemens Gamesa WTGs and total capacity is 93 MW. Power production started in summer 2017.

Tervola Varevaara

Wind farm consists of 10 pcs V112 Vestas WTGs. Total capacity is 30 MW. Power production started in winter 2013.

Tornio Kitkiäisvaara

Wind farm consists of 8 pcs G128 Gamesa WTGs. Total capacity is 36 MW. Power production started in winter 2015.

Ii Viinamäki

Wind farm consists of 5 pcs V150 Vestas WTGs. Total capacity is 21 MW. The construction of  Viinamäki wind farm was completed in October 2019.